Tipper - The Critical Path
Title: The Critical Path
Category: Electronic
Style: Breakbeat, Abstract, IDM, Experimental
Year: 2000
Notes: Promo / sampler versions with less tracks do not belong with the album Rating: 4.7
Format: XM AU MP1 AC3 MP3 MIDI MPC FLAC MP3
MP3 album RAR size: 1463 mb | FLAC album RAR size: 1272 mb
Category: Electronic
Download Links
- 1272 downloads at 23 mb/s
MP3 version RAR archive
- 1463 downloads at 31 mb/s
FLAC RAR archive
Tracklist
| Seldom Vile | 5:12 |
| Twister | 4:49 |
| L.E.D Down | 4:37 |
| Dissolve (In) | 5:17 |
| Dissolve (Out) | 4:09 |
| Supersport | 3:47 |
| Sort Code | 5:45 |
| Cable To Continue | 4:54 |
| Night Vision | 5:44 |
| Last Informer | 5:14 |
| On Condition (The Condition) | 6:53 |
| (silence) | 1:00 |
| Untitled | 5:30 |
Versions
| Category | Artist | Title (Format) | Label | Category | Country | Year |
|---|---|---|---|---|---|---|
| HIGH9CD, 4946852000 | Tipper | The Critical Path (CD, Album) | Higher Ground, Higher Ground | HIGH9CD, 4946852000 | UK | 2000 |
| HIGH9LP, 4946851000 | Tipper | The Critical Path (2xLP, Album) | Higher Ground, Higher Ground | HIGH9LP, 4946851000 | UK | 2000 |
| HGCD34 | Tipper | The Critical Path (CD, Album, Promo) | Higher Ground | HGCD34 | UK | 2000 |

Tipper - LED Down
Morgana King - Higher Ground
Jackie Lomax - Higher Ground
Tipper Featuring Deborah Anderson - Dissolve (Out)
Sanne Salomonsen - Higher Ground
Tammy Wynette - Higher Ground
Red Hot Chili Peppers - Higher Ground
Rollercoaster - Higher Ground / I Wish
DJ Rap - Bad Girl
Jennifer Rush - Higher Ground